The following is the update from the Construction Coordination meeting on 7/09/09.
1. The Oak Creek Bridge construction is temporarily on hold pending resolution of some design issues. There are several meetings scheduled next week for regular communication and to resolve the design issues. Staff will provide an update on the status following those meetings.
2. A minor traffic shift is planned to be in place at Morgan Wash on SR 179 on Monday 7/13.
3. The Bowstring Drive utility work is complete. Another closure will be necessary to patch the pavement. Residents will be notified prior to the next closure.
4. A traffic shift is in place in front of Poco Diablo and the retaining wall work on the north side of the road is continuing.
The overall project is 74 percent complete - thank you for your patience throughout the construction.
1. The Oak Creek Bridge construction is temporarily on hold pending resolution of some design issues. There are several meetings scheduled next week for regular communication and to resolve the design issues. Staff will provide an update on the status following those meetings.
2. A minor traffic shift is planned to be in place at Morgan Wash on SR 179 on Monday 7/13.
3. The Bowstring Drive utility work is complete. Another closure will be necessary to patch the pavement. Residents will be notified prior to the next closure.
4. A traffic shift is in place in front of Poco Diablo and the retaining wall work on the north side of the road is continuing.
The overall project is 74 percent complete - thank you for your patience throughout the construction.